Solution: exploring drawings provided by foreign party further, working actively with the design party and Party A to propose various solutions according to real status
As the design drawings were made by a foreign design company, multiple issues arose in the deepening process. The project designers worked positively with the design company and makes sure that the project proceeds as per schedule. In the fabrication and installation process, multiple parties worked together to cope with the progress of the basic construction work and arranged for the installation of identification systems on time and finally completed the project without problems.